SaskPower, Saskatoon Light & Power, Swift Current Light & Power
Electricity is banked and stored on the grid as a credit. Maximum system must not exceed 100kW.
Any excess power is credited at 7.5 cents per kWh.
No rebate available at this time.
Build your project with us and we can take care of the entire process for you. Alternatively, visit SaskPower for further details.
SaskPower
Electricity is purchased from the power generation partner at a reduced rate. Maximum system size may not exceed 1MW.
The rate paid to customers is 10.8 cents/kWh. This increases at a rate of 0.6 percent per year.
Capital Cost Allowance Credit
Build your project with us and we can take care of the entire process for you. Alternatively, visit SaskPower for further details.
CAPITAL COST
Current Capital Cost
Allowance
Proposed Capital Cost
Allowance (maximum 100%)
Manufacturing and processing machinery and equipment
25%
100%
Clean energy equipment
25%
100%
Computer software
50%
100%
Computers
27.5%
82.5%
Trucks and tractors for hauling freight
20%
60%
Motor vehicles
15%
45%
Earth-moving equipment
15%
45%
Data network infrastructure equipment
15%
45%
Aircraft
12.5%
37.5%
Office equipment
10%
30%
Fibre-optic cables
6%
18%
Buildings used in manufacturing and processing
5%
15%
Other non-residential buildings
3%
9%